HPE DL325 Gen11 vs Lenovo SR635 V3
A specification-by-specification comparison of the HPE ProLiant DL325 Gen11 and the Lenovo ThinkSystem SR635 V3, built from HPE’s and Lenovo’s own documents. 2 headline measures favour the DL325 Gen11, 2 favour the SR635 V3, and 37 processors appear in both lists.
Bottom line. DL325 Gen11 leads on storage density. SR635 V3 leads on AI and acceleration, network throughput. Neither vendor publishes benchmarks for these machines, so every call here is made on what their documents state.

The measures that decide it
Each row is a figure both vendors publish. Bars show the split between the two; a badge marks the larger figure, which is not always the better buy — a shallower chassis or a lower power ceiling can matter more.
Which one, and why
Drawn from the measures above and each model’s own data sheet. Neither vendor publishes benchmark results for these servers, so nothing here claims one is “faster”.
Choose the DL325 Gen11 if…
- Drive bays: 20 against 16 on the SR635 V3
- Largest power supply: 2,200 W against 1,800 W on the SR635 V3
- Both EPYC generations in one chassis: HPE’s tables list 21 5th Gen and 19 4th Gen processors, from the 8-core 9015 to the 160-core 9845, including the 9684X with 1,150 MB of L3.
Choose the SR635 V3 if…
- Accelerators: Up to 5 against Up to 4 on the DL325 Gen11
- Fastest network option: 400 GbE class against 200 GbE class on the DL325 Gen11
- All twelve DDR5 channels belong to the one processor, so a single socket still reaches 3 TB with 256 GB 3DS RDIMMs, and 5th Gen EPYC can clock that memory at up to 6400 MHz.
Where each one pulls ahead
Calls made on documented capacity only — cores, memory, bays, accelerators and network options — with the figures behind each one shown.
Side by side, differences first
Everything both documents state, grouped. The default view hides rows where the two machines are identical.
Processors
Every processor each vendor lists for the model, from its own document.
| Specification | DL325 Gen11 | SR635 V3 |
|---|---|---|
| Processors listed | 40 | 45 |
Memory
| Specification | DL325 Gen11 | SR635 V3 |
|---|---|---|
| Memory types | RDIMM DDR5-6400 · RDIMM DDR5-4800 · 3DS RDIMM DDR5-6400 | RDIMM DDR5-6400 (5th Gen EPYC) · RDIMM DDR5-4800 (4th Gen EPYC) · 9x4 RDIMM · 3DS RDIMM DDR5-6400 |
Storage
Bay counts are the maximum each document states, including rear and mid-chassis positions.
| Specification | DL325 Gen11 | SR635 V3 |
|---|---|---|
| Maximum bays | 20 | 16 |
| Documented layouts | 8 | 14 |
| Bay sizes | 2.5-inch · 3.5-inch · E3.S | 2.5-inch · E3.S |
| Boot devices | HPE NS204i-u Gen11 NVMe Hot Plug Boot Optimized Storage Device · HPE NS204i-u v2 480GB NVMe Hot Plug Boot Optimized Storage Device · HPE NS204i-u v2 960GB NVMe Hot Plug Boot Optimized Storage Device + 2 more | M.2 SATA/NVMe 2-Bay Enablement Kit (4Y37A09738) · M.2 SATA/x4 NVMe 2-Bay Adapter (4Y37A79663) · M.2 NVMe 2-Bay RAID Adapter (4Y37A09750) + 1 more |
| Storage controllers | 12 | 17 |
Accelerators & I/O
| Specification | DL325 Gen11 | SR635 V3 |
|---|---|---|
| Accelerators supported | Up to 4 | Up to 5 |
| OCP slots | 2 | 1 |
| PCIe network slots | 2 | 5 |
| Network cards listed | 33 | 30 |
Power & platform
| Specification | DL325 Gen11 | SR635 V3 |
|---|---|---|
| Power-supply options | 6 | 8 |
| Output range | 500–2,200 W | 750–1,800 W |
| Management | HPE iLO 6 | XClarity Controller 2 |
| Chassis depthVendors measure depth differently — see each data sheet | 8SFF: 64.94 cm (25.57 in) | — |
Processors, memory, bays and power
The same charts each data sheet carries, drawn to the same scale so the two ranges can be read against each other.
DL325 Gen11: processors by cores and TDP
SR635 V3: processors by cores and TDP
DL325 Gen11: memory with every slot filled
SR635 V3: memory with every slot filled
DL325 Gen11: drive bays
Front panel
20 × EDSFF NVMe at the front — 20 bays in total.
SR635 V3: drive bays
Front panel
16 × EDSFF NVMe at the front — 16 bays in total.
DL325 Gen11: power supplies
SR635 V3: power supplies
37 processors you can order in either
Both vendor documents list these parts, so a build can be matched across the two and the comparison comes down to the chassis: 3 more are exclusive to the DL325 Gen11 and 8 to the SR635 V3.
| Processor | Cores | TDP |
|---|---|---|
| AMD EPYC 9845 | 160 | 390 W |
| AMD EPYC 9825 | 144 | 390 W |
| AMD EPYC 9745 | 128 | 400 W |
| AMD EPYC 9754 | 128 | 360 W |
| AMD EPYC 9734 | 112 | 340 W |
| AMD EPYC 9645 | 96 | 320 W |
| AMD EPYC 9655P | 96 | 400 W |
| AMD EPYC 9654P | 96 | 360 W |
| AMD EPYC 9634 | 84 | 290 W |
| AMD EPYC 9565 | 72 | 400 W |
| AMD EPYC 9535 | 64 | 300 W |
| AMD EPYC 9575F | 64 | 400 W |
DL325 Gen11 vs SR635 V3, answered
Is the DL325 Gen11 or the SR635 V3 the faster server?
Neither document publishes benchmark results, so this page compares what they do state. The DL325 Gen11 lists 40 processors up to 160 cores at 400 W; the SR635 V3 lists 45 up to 160 cores at 400 W. Fully populated that is 160 cores against 160.
Which holds more memory?
The DL325 Gen11 has 12 DIMM slots and a stated ceiling of 3.0 TB. The SR635 V3 has 12 and 3 TB.
Which takes more drives?
DL325 Gen11: 20 bays across 8 documented layouts. SR635 V3: 16 across 14. Counts include rear and mid-chassis positions where the vendor documents them.
Can either take GPUs?
DL325 Gen11: up to 4 accelerators, 0 double-wide cards listed. SR635 V3: up to 5, 0 double-wide listed.
Do they share any processors?
Yes — 37 processors appear in both documents, including the AMD EPYC 9845. That makes a like-for-like build possible on either server.
Where these figures come from. DL325 Gen11: HPE ProLiant DL325 Gen11 QuickSpecs (Version 40 - 03-Aug-2026) (HPE document). SR635 V3: Lenovo ThinkSystem SR635 V3 Server Product Guide (publication date is not printed in the text export; guide contains ‘New as of July 2026’ notes) (Lenovo document). Each claim on this page is derived from those documents, checked page by page on the two data sheets, and carries no pricing.
Other comparisons in this class
Talk to a UK specialist
Get expert advice or a no-obligation quote — servers, storage, networking, maintenance, finance and cloud. We reply the same working day.
